The production line includes processes such as fuel cell stack installation, end plate component assembly, pipeline assembly, air compressor assembly, circulation pump assembly, pipeline & system harness assembly, accessory assembly, airtightness testing, and electrical testing, completing the assembly production of various components of the engine system. It consists of ergonomically designed workstations, fuel cell stack installation tools, assembly stations, airtightness testing, and electrical performance testing.
Advantages and Highlights:
The production capacity reaches 4-6 units/hour.
Equipped with multiple tests such as airtightness testing, controlled power-on testing for IO, and insulation testing.
Robot loading and unloading, using high-pixel CCD, with high product positioning accuracy.
The production line takes into account ergonomics and mistake-proof design.
AGV conveying return system with production line fixtures
The CNC electric screwdriver uploads torque data to the MES system in real time, and the data is fully traceable.
The hanging positions and load requirements for tools such as lighting systems, hoisting slide rails, and tightening guns comply with ergonomic principles for the use of hanging tools.
The production capacity reaches 4-6 units/hour.
Equipped with multiple tests such as air tightness, controlled power on IO, insulation, etc.
Using a high-pixel CCD, the product positioning accuracy is high.
Real-time data upload to the MES system, data traceable throughout the process.
Jig AGV Conveying Return Flow System